Blue Line Extension Project Decision Board (PDB) Meeting

Regular Meeting
July 15, 2026 | 9:00 a.m.
Location: Blue Line Extension Project Office - 6465 Wayzata Blvd., St. Louis Park, MN 55426 (6th Floor)


Agenda

  1. Call To Order                                                                                                                                                            Action Required
  2. Minutes from February 18, 2026, Meeting Approval                                                                                            Approval
  3. Discussion of Scope Reduction Items                                                                                                                   Discussion
  4. Resolution 26-PDB-15: Modify Oak Grove Park & Ride                                                                                        Approval
    • BE IT RESOLVED, that the PDB hereby directs Project Staff to request to the FTA a project scope change that to decrease the project scope from 250 structured parking spaces to 100 surface parking spaces along with a small building for Metro Transit Rail Operations readiness/operator restroom function the Oak Grove station and the change is reflected in a revised METRO Blue Line Extension project scope and budget.
  5. Resolution 26-PDB-16: Remove the 63rd Avenue Pedestrian Bridge                                                                 Approval
    • BE IT RESOLVED, that the PDB hereby directs Project Staff to request to the FTA a project scope reduction that removes the 63rd Pedestrian Bridge from the METRO Blue Line Extension project scope and budget.
  6. Resolution 26-PDB-17: Reduce Finance charges                                                                                                  Approval
    • BE IT RESOLVED, that the PDB hereby directs Project Staff to request to the FTA a modification to the METRO Blue Line Extension budget that reflects an elimination of Finance Charges in the project budget.
  7. Resolution 26-PDB-18: Reduce Budget Estimate for Systems Construction                                                      Approval
    • BE IT RESOLVED, that the PDB hereby directs Project Staff to request to the FTA a modification to the METRO Blue Line Extension budget that reflects the updated Systems Construction Costs estimate.
  8. Discussion on Requesting Reduction in Project Contingency                                                                            Discussion
  9. Next Meeting: August 19, 2026