I-35E River Bridge Sewer Repair

Project 809512

Text Alert Icons Project Alert

Project Update - September 2, 2026 (PDF).  See previous Project Updates below.

Join us out in the community

The project team invites you to join us at the Saint Paul Classic Bike Tour to learn more about the project.

Sunday, September 13
10:15 a.m. - 1:15 p.m.
Como Lakeside Pavilion

Project Description

Met Council, operator of the metro area wastewater collection and treatment system, is setting up a temporary wastewater conveyance system to facilitate replacement of deteriorating sanitary sewer pipes under the Mississippi River parallel to the I-35E bridge.

System set up will start in fall 2026. The system will remain in place approximately 3 to 5 years while a new sanitary sewer pipe river crossing is designed and built. There will be temporary trail closures during set up. No wastewater service disruptions are anticipated.

Temporary conveyance examples

Large black pipeline running along a multi-lane highway, with vehicles traveling below and a freight train crossing an overpass ahead.
Pipeline monitoring equipment and an access hatch installed in a grassy area beneath a bridge.
Three construction workers installing a large section of black pipeline on a rocky worksite near a bridge.

Project Map

Map of area northeast of Crosby Farm Regional Park in Saint Paul showing work area at and around the Interstate 35E Mississippi River crossing.  The Big Rivers Regional Trail is closed on the south side of the river from a little ways east of Highway 55 to just past the I35E bridge.  Described clockwise, the detour uses Shepard Road, Otto Avenue, 7th street West/Highway 5, and Cliff Street on the Crosby Lake side of the River, uses Smith Avenue North to cross the river, and then continues along Smith to Butler Avenue West, Charlton Street, Marie Avenue West, and Victoria Road South.

Project Need

  • Existing Met Council regional sanitary sewer pipes under the Mississippi River are failing and in need of replacement.
  • A temporary wastewater conveyance system is needed to provide service should the existing pipelines completely fail.
  • There is a temporary conveyance system that will be installed in case of complete failure of the Siphons (3-barrels). This system will remain in place until a design can be executed to replace the 3 barrels. This design could take 3-5 years.

What to expect:

The Met Council is committed to being a good neighbor. While we do our best to minimize impacts during construction, some temporary inconveniences may occur as the work takes place. Here is what you can expect:
  • Construction traffic
  • Lights, noise, vibration, and dust consistent with construction activity
  • Temporary odors related to sewer work
  • Temporary road and sidewalk detours and/or closures. We will plan appropriate detours and partner with the City of Lilydale, City of Saint Paul, City of Mendota Heights, and MnDOT, to minimize community impacts.
The bike trail on I-35E will be closed and detoured starting September 14 through 2026 (weather and schedule-dependent) during temporary wastewater conveyance system installation. The trail will open after the pipe is installed.
 

Project Timeline

  • Design: March through August 2026
  • Construction: September through December 2026

Project Updates

Project Update - September 2, 2026 (PDF) 625 kB

Project Staff

Project Manager: Jeff Schwarz, Minneapolis Area Program Manager, Interceptor Engineering
 

Project Contacts

If you have any questions or concerns about this project, please contact:

Email: [email protected]
Phone: 651-448-7166
 