NE Minneapolis Sewer Rehabilitation

Project 809211

Text Alert Icons Project Alert

Project Update - August 3, 2026 (PDF).  See previous Project Updates below.

To receive project updates via email or text, sign up using the E-newsletter/SMS subscription form on the right.
 

Project Description

Metropolitan Council Environmental Services (Met Council), operator of the metro-area wastewater collection and treatment system, will be repairing a major sewer line in Northeast Minneapolis. Repair includes installing new maintenance holes and inserting a new pipe inside the old one using a process called cured-in-place pipe (CIPP) lining.  Temporary wastewater conveyance pipes will maintain the continuous flow of wastewater around the construction site.

The location of the pipe needing repair is shown below:

A map showing sanitary sewer pipe maintenance at and near Columbia Park in Northeast Minneapolis.  The project starts at Saint Anthony Parkway on the north side and extends south to approximately 30th Avenue Northeast.  The western boundary is near Marshall Street Northeast, and the eastern boundary is west of Polk Street Northeast.  A temporary wastewater pipe runs along Saint Anthony Parkway, along the bike trail on the south end of Columbia Park, to about one block east of Central Avenue Northeast.

Project impacts

Met Council plans to begin work in August of 2026. Construction will be completed by December 2026. The following pedestrian, bike, and vehicle routing interruptions are anticipated:
  • Short-term traffic disruptions.
  • Parts of Tyler Street NE between 31st Avenue NE and 32nd Avenue NE and Randolph Street NE near 31st Avenue NE will be closed throughout construction for installation and operation of a temporary wastewater pumping station. While some street parking options will be inaccessible during construction, full alley access will be maintained.
  • Noise, dust and odors where the temporary wastewater pump system will be installed.
  • Vegetation impacts due to installation of temporary wastewater pumps.
  • The trail on the south side of St. Anthony Parkway will be closed between Central Avenue NE and Columbia Avenue NE to accommodate two temporary wastewater conveyance pipes. Bike and pedestrian traffic will be detoured to the St. Anthony Parkway north-side trail.
  • The St. Anthony Parkway Off-Leash Dog Park will remain open but parts will be fenced off during construction.  The archery range will be closed for the duration of the project.
Timing of the closures and detours is subject to change.
 

Learn More

“What’s That Smell?”
As wastewater crews fix our pipes from the inside, you might smell - well, poop. Another smell you might notice is a little bit like glue. These smells are normal, and they can escape during repair. Our crews will monitor odors to meet air quality standards and we’ll do our best to reduce them during construction.


 

Project Updates

Project Update - August 3, 2026 (PDF) 359 kB

Project Staff

Project Manager: Jeff Schwarz, Project Manager, Interceptor Engineering

Project Contacts

If you have any questions or concerns about this project, please reach out through the project email or hotline at:

Sign up for E-newsletter/SMS at the top right of the page.

Capital Improvement Program
Contact us

Contact project staff with questions or concerns about this project.

Email: [email protected]

Phone: 612-421-8477