Project Description

Metropolitan Council Environmental Services (Met Council) is rehabilitating a pipe located outside Lift Station L30 in the city of Crystal. A routine pipe inspection showed that the pipe has sagged due to poor soil, and debris has built up in the pipe, making it hard to clean and preventing proper flow of sewage in the pipe. Repair work will begin in mid-June 2026 and is anticipated to be completed in August 2026, with final restoration in fall 2026. Rehabilitation will include replacing the existing pipe with a new one and relocating it to improve ease of maintenance.   

The improvements will be at and around Lift Station L30, shown below:
 
A stick map indicating limited traffic access located at the intersections of Quail Avenue North and 53rd Avenue North, and Quail Ave North and Angeline Ave North. “Local traffic only” signs appear on Wilshire Boulevard, 54th Avenue North, 53rd Avenue North, and Perry Avenue North. A small area of the 53rd Ave North roadway in front of the Lift Station with be closed.

Project Impacts

People who live near the project area may experience traffic disruptions, potential odors, dust and noise. 
  • Single lane only on portions of Quail Avenue N., Angeline Avenue N., and 53rd Avenue N. will be in place throughout construction.
  • Access limited to local traffic only at the intersections of 53rd Avenue N./Scott Avenue N., 54th Avenue N./Quail Avenue N., and 54th Avenue N./Perry Avenue N. during construction.
  • Crews will install temporary conveyance pipes to move wastewater around the construction area until the new pipe is in place. 
  • Settlement and vibration monitoring will be conducted during excavation to help ensure nearby properties and site conditions are protected throughout construction. 
Timing of the closures and detours is subject to change.

Temporary conveyance pipes will be installed to maintain water service for surrounding properties until the new pipe is in place. These pipes will be installed above ground and will run along the roadway. Residents can expect lane closures and roads limited to local traffic only. Settlement and vibration monitoring will be conducted during excavation to help ensure nearby properties and site conditions are protected throughout construction.
 

Learn More

“What’s That Smell?”
As wastewater crews fix our pipes from the inside, you might smell - well, poop. Another smell you might notice is a little bit like glue. These smells are normal, and they can escape during repair. Our crews will monitor odors to meet air quality standards and we’ll do our best to reduce them during construction.
 


 
 

Project Updates

Minger will be conducting structural pre-inspection work for some homes in the project area in the coming weeks.
 
Project Update - September 4, 2026 (PDF) 491 kB

Project Update - August 21, 2026 (PDF) 323 kB

Project Update - August 7, 2026 (PDF) 445 kB

Project Update - July 24, 2026 (PDF) 533 kB

Project Update - July 10, 2026 (PDF) 133 kB

Project Staff

Project Manager: Jeny Baroda, Principal Engineer, Interceptor Engineering
Construction Manager: Joel Benton, Principal Contract Administrator, Construction Services
 

Project Contacts

Contact project staff with questions or concerns about this construction project.

Email: [email protected]
Phone: 612-361-0141

Sign up for E-newsletter (email) or SMS (text) updates on the right.
Capital Improvement Program
Contact us

Contact project staff with questions or concerns about this construction project.

Email: [email protected]

Phone: 612-361-0141