Crow River Water Resource Recovery Facility

Project 809900

Text Alert Icons Project Alert

Project Update - July 30, 2026: Project number updated.  See previous Project Updates below.

To receive project updates via email or text, sign up using the E-newsletter/SMS subscription form on the right.
 

Project Description

In 2018, to prepare for the Crow River Water Resource Recovery Facility, Metropolitan Council Environmental Servies purchased a plot of land approximately three miles west of the existing Met Council Rogers Wastewater Treatment Plant. This site is in a rural residential area, adjacent to the Three Rivers Crow-Hassan Park with a waterfront along the Crow River.
 
Met Council is prioritizing protecting the Crow River and building the new facility to be environmentally sustainable. The water discharged into the Crow River from the new facility will be of higher quality than what is currently discharged from the existing facility. The new facility will also feature sustainable landscaping to help protect the Crow River and the surrounding environment.

The flow that is currently collected and treated at the Rogers Wastewater Treatment Plan will be redirected to the site of the new Crow River Water Resource Recovery Facility via a new lift station and plant-to-plant interceptor. The lift station and plant-to-plant interceptor will be constructed prior to the startup of the Crow River Water Resource Recovery Facility. The lift station will be constructed on the site of the existing Rogers Wastewater Treatment Plant to convey wastewater to the new Crow River Water Resource Recovery Facility. Met Council will work collaboratively with the City of Rogers to site the route for the new interceptor.
 
After the startup of the new Crow River Water Resource Recovery Facility, Met Council will decommission the Rogers Wastewater Treatment Plant and return unused existing facility site land back to the city for redevelopment. 
 
Two open houses and a public hearing were held in Rogers in late 2024, at which the facility plan for the Crow River Water Resource Recovery Facility was presented.  Materials from those events are available below.
The public had an opportunity to provide feedback on the facility plans at the open houses and public hearing as well as during the subsequent public comment period.
December 5, 2024, first open house; facility plan presented; facility plan posted on project website. January 8, 2025, second open house and public hearing. January 18, 2025, public comment period closes.

 

Project Updates

Project Update - February 4, 2025 (PDF) 118 kB

Project Update - December 30, 2024 (PDF) 138 kB

Project Staff

Project Manager: Mark Lundgren, Principal Engineer, Plant Engineering
Council's Authorized Representative: Sadie Wolf, Principal Contract Administrator, Construction Services
 

Project Contacts

For assistance, call | Si necesita ayuda, llame al | Xav tau kev pab, hu | Wixii kaalmo ah, ka wac | Để được hỗ trợ, hãy gọi | လၢတၢ်ဃ့န့ၢ်တၢ်မၤစၢၤအဂီၢ, ကိးဘၣ်ဖဲ | 651-240-5344.

Email: [email protected]

Sign up for E-newsletter/SMS on the right side of the page.

Capital Improvement Program
Contact us

For assistance, call | Si necesita ayuda, llame al | Xav tau kev pab, hu | Wixii kaalmo ah, ka wac | Để được hỗ trợ, hãy gọi | လၢတၢ်ဃ့န့ၢ်တၢ်မၤစၢၤအဂီၢ, ကိးဘၣ်ဖဲ | 651-240-5344.

Email: [email protected]